IronhandLoad calc
Worksheet

The job

Dwelling units
Units on this service
8
Building service
Service voltage
Existing service
Upgrade to
Circuits at 1,500 VA each

Heating and cooling

Appliances

House loads

Everything not inside a unit: hall and exterior lighting, common laundry, elevator, fire pump, EV chargers in the lot. These count at 100%, on top of the units.

What you're adding

EV charger

The charger's rated amps, not the breaker. A 48 A charger goes on a 60 A breaker.

Other new load

Utility data

NEC 220.87 counts that peak at 125%, plus what you add. On an older house it often shows more room than the calculated methods.

How we got there

A worksheet, not a stamped calc. It follows the 2020 and 2023 NEC. Check it against the code your town has adopted and the equipment nameplates. Generators and commercial buildings aren't covered.

0 Aof 200 A